PLED70S

PLED70S

$0.25
  • Description:LIGHT PROTECT LED SHUNT 63V SMD
  • Series:PLED®
  • Mfr:Littelfuse Inc.
  • Package:Tape & Reel (TR)

SKU:2dfdaa30cdc2 Category: Brand:

  
  • Quantity
    • -
    • +
  •    
ChipApex WhatsApp

Consult the customer manager about the wholesale price.

consultation hotline:86-132-6715-2157

email:chipapexlimited@gmail.com
Contact the product manager for consultation. One-stop consultation is available.


Do you want a lower wholesale price? Please send us your inquiry and we will reply immediately.

*
*
*
*
Submitting!
Submission successful!
Submission failed!
Email error!
Phone number error!

Product Detailed Parameters

  • Description:LIGHT PROTECT LED SHUNT 63V SMD
  • Series:PLED®
  • Mfr:Littelfuse Inc.
  • Package:Tape & Reel (TR)
  • Voltage:63V
  • Technology:LED Shunt
  • Number of Circuits:1
  • Applications:LED Drivers, AC/DC SMPS
  • Grade:-
  • Qualification:-
  • Mounting Type:Surface Mount
  • Package / Case:DO-214AA, SMB
  • Supplier Device Package:DO-214AA
  • Voltage - Clamping:81 V

Download product information

PLED70S

Buying Guide
Summary

Littelfuse Inc. PLED70S is sourced in Lighting Protection category when teams want clear constraints and a repeatable validation path. Key specs include Description (LIGHT PROTECT LED SHUNT 63V SMD), Series (PLED®), Packaging (Tape & Reel (TR)), Package/case (DO-214AA, SMB), and Mounting (Surface Mount).

Selection Notes
  • For PLED70S, verify Voltage - Clamping (81 V) and compare it against your reference design limits.
  • Ensure the package/case (DO-214AA, SMB) and land pattern match your PCB layout before procurement.
  • Confirm the mounting type (Surface Mount) is suitable for your production flow and reliability target.
  • Make sure Number of Circuits (1) aligns with your design targets and verification plan.
Alternates & Substitutions
  • For Lighting Protection substitutions, lock footprint/pinout and operating envelope first, then verify the critical performance conditions on your hardware.
  • Treat package/case DO-214AA, SMB, supplier package DO-214AA, mounting Surface Mount as the first filter, then move on to electrical and performance checks.
  • When in doubt, treat the swap as an ECO: define acceptance criteria, then validate under worst-case operating corners.
  • If you already have candidate alternates, send the list and we can check drop-in risks against (package DO-214AA, SMB).
FAQ

Who is the manufacturer of PLED70S?
Littelfuse Inc.

What should I verify before using PLED70S in production?
Confirm footprint/pinout, min/max ratings, operating temperature, and the datasheet test conditions behind key specifications.

What Technology does PLED70S have?
LED Shunt

What mounting style is specified for PLED70S?
Surface Mount

Application Scenarios

In real deployments, when sourcing Littelfuse Inc. PLED70S for Lighting Protection, engineers typically focus on de-risking integration and keeping validation repeatable. They keep abnormal events bounded by coordinating fusing, suppression, and thermal mechanisms into predictable responses. Selection depends on response time, let-through energy, surge rating, leakage, and coordination with upstream supplies and wiring. Within automotive harnesses, protection mitigates ESD and transients during connector hot-plug and load dump events. Across chargers and adapters, thermal protection and fusing reduce fire risk and improve regulatory compliance. Across telecom and networking, protection reduces downtime from cable faults and hot-plug events in always-on racks. Across practice, teams look for a path to verify the key assumptions without turning the integration into a one-off tuning exercise. In practice, for systems shipped at volume, predictable behavior is what keeps yield and field performance stable.

Compatibility Advice
  • For production stability, confirm dimming, PWM, and flicker behavior meets your end-use requirements, not only bench observations before freezing the BOM.
  • To avoid late surprises, confirm current regulation accuracy so brightness matching remains stable across temperature and production variance before release to production.
  • In board-level integration, validate thermal rise and optical or luminous output under the real duty cycle so performance does not drift after heat soak before committing to volume builds.
Project Fit
  • Best fit for Lighting Protection when you can validate the key assumptions on the assembled system and keep acceptance criteria measurable.
PLED70SPLED70S
$0.25
Buy Now