STPM11ATR

STPM11ATR

$1.01
  • Description:IC ENERGY METER 1 PHASE 20TSSOP
  • Series:-
  • Mfr:STMicroelectronics
  • Package:Tape & Reel (TR)

SKU:e5219c9f44dc Category: Brand:

  
  • Quantity
    • -
    • +
  •    
ChipApex WhatsApp

Consult the customer manager about the wholesale price.

consultation hotline:86-132-6715-2157

email:chipapexlimited@gmail.com
Contact the product manager for consultation. One-stop consultation is available.


Do you want a lower wholesale price? Please send us your inquiry and we will reply immediately.

*
*
*
*
Submitting!
Submission successful!
Submission failed!
Email error!
Phone number error!

Product Detailed Parameters

  • Description:IC ENERGY METER 1 PHASE 20TSSOP
  • Series:-
  • Mfr:STMicroelectronics
  • Package:Tape & Reel (TR)
  • Input Impedance:100kOhm
  • Measurement Error:0.10%
  • Voltage - I/O High:1.5V
  • Voltage - I/O Low:0.8V
  • Current - Supply:4.7mA
  • Voltage - Supply:3 V ~ 5.5 V
  • Meter Type:Single Phase
  • Operating Temperature:-40°C ~ 85°C
  • Mounting Type:Surface Mount
  • Package / Case:20-TSSOP (0.173", 4.40mm Width)
  • Supplier Device Package:20-TSSOP
  • Grade:-
  • Qualification:-

Download product information

STPM11ATR

Buying Guide
Summary

STMicroelectronics STPM11ATR is used in Energy Metering category where integration and verification need to stay predictable. Key specs include Description (IC ENERGY METER 1 PHASE 20TSSOP), Packaging (Tape & Reel (TR)), Supply (3 V ~ 5.5 V), Temperature (-40°C ~ 85°C), and Package/case (20-TSSOP (0.173", 4.40mm Width)).

Selection Notes
  • For STPM11ATR, verify the operating temperature range (-40°C ~ 85°C) and derate as needed in your application.
  • Validate Meter Type (Single Phase) under the expected test conditions in your application.
  • Double-check the mounting type (Surface Mount) for your intended installation method.
  • Confirm the characteristic impedance (100kOhm) matches your transmission line and matching network.
Alternates & Substitutions
  • In Energy Metering, confirm that alternates preserve startup states and fault behavior so system behavior does not change quietly.
  • Before approving a second source, compare the functional mode matrix and the test conditions behind the marketing headline specs.
  • Then confirm the operating envelope (supply 3 V ~ 5.5 V, temperature -40°C ~ 85°C) with margin for transients and derating.
  • Confirm compliance/qualification needs (for example RoHS/REACH or grade) before approving a second source for production.
FAQ

Who is the manufacturer of STPM11ATR?
STMicroelectronics

How do I confirm compatibility for STPM11ATR?
Match mechanical footprint first, then verify electrical limits and operating conditions against your system constraints.

Which Supplier Device Package is specified for STPM11ATR?
20-TSSOP

What is the supply voltage range of STPM11ATR?
3 V ~ 5.5 V

Application Scenarios

In practice, the question for STMicroelectronics STPM11ATR in Energy Metering is whether it stays inside the electrical/thermal envelope while remaining easy to validate and support. Good analog integration simplifies validation by reducing sensitive external networks that would otherwise vary across builds. They condition, convert, or interface signals so systems can capture or generate analog information with defined accuracy, latency, and noise behavior. Energy metering designs emphasize accuracy across load range, phase error, calibration flow, and EMI resilience on mains-connected front ends. From an engineering workflow standpoint, this is where bench validation and field constraints meet. In practice, within industrial automation, signal-chain choices are validated for EMI resilience and repeatable accuracy near motors and contactors. In practice, taken together, careful selection and validation lower integration risk and raise field reliability.

Compatibility Advice
  • With the real source, load, and wiring, verify input protection and common-mode range for the real sensor and cabling, not just the schematic source. This keeps integration from depending on typical-only conditions.
Project Fit
  • Strongest fit when you can bench-verify STMicroelectronics STPM11ATR for Energy Metering integration in the final enclosure, when you have test access to validate noise, settling, and interface timing. On the other hand, not ideal when integrating STMicroelectronics STPM11ATR for Energy Metering, production test access is too limited to verify the key performance metrics, because repeatable production verification is not feasible.
STPM11ATRSTPM11ATR
$1.01
Buy Now